Mar 28, 2014

Duncan City Hall

This is our spring 2014 project at Duncan City Hall
Category: General
Posted by: mercury

The innovative Mitsubishi City Multi equipment getting delivered on site


Part of the HVAC distribution is using ductless heads in the main area 


This system fully modulates, and uses Hyper-Heat Inverter technology enabling full capacity down to an outdoor temperature of -25°C. This system uses a combination of ducted and ductless indoor units to obtain maximum comfort in the building.

Site maintained by Matt Hornsby Production Graphics